George S.
New member
The field of "Philip II" as "Emirates"
http://www.vest.com.mk/?ItemID=CA6DDB044F82EF45B8C2E1D1A0EFE39D
National Arena "Philip II" will get most modern terrain after lines of "Emirates" Arsenal Stadium in London.
The pitch will be a combination of natural and artificial grass and its setting are expected to be the end of the month.
the briefing today, General Secretary of the Football Federation of Macedonia Igor Klimper informed that the court of "Philip II" will be one of the most modern in Europe. Under the project, provided it will be placed underground heating up, and it will have eight athletic tracks with tartan-surface.
"I believe that the pitch will be ready by July 10, when our representatives in European football piles will have to play first matches. If not completed by that date, the clubs will have to seek alternative venues. In that case, the only solution is to use the stadium in Kumanovo, or to play abroad, "said Klimper.
reconstruction of the field and the athletic path national arena, "Philip II" began on November 9 last year. The total reconstruction of the athletic field and track, scheduled to be completed by the end of March, costing 3.5 million euros.
http://www.vest.com.mk/?ItemID=CA6DDB044F82EF45B8C2E1D1A0EFE39D
National Arena "Philip II" will get most modern terrain after lines of "Emirates" Arsenal Stadium in London.
The pitch will be a combination of natural and artificial grass and its setting are expected to be the end of the month.
the briefing today, General Secretary of the Football Federation of Macedonia Igor Klimper informed that the court of "Philip II" will be one of the most modern in Europe. Under the project, provided it will be placed underground heating up, and it will have eight athletic tracks with tartan-surface.
"I believe that the pitch will be ready by July 10, when our representatives in European football piles will have to play first matches. If not completed by that date, the clubs will have to seek alternative venues. In that case, the only solution is to use the stadium in Kumanovo, or to play abroad, "said Klimper.
reconstruction of the field and the athletic path national arena, "Philip II" began on November 9 last year. The total reconstruction of the athletic field and track, scheduled to be completed by the end of March, costing 3.5 million euros.
